- Residential
- Commercial
- New Construction & Additions

About the service
We manage new construction projects and property expansions from concept to completion.
Our team coordinates every stage, from planning and permitting to execution, ensuring a structured and controlled process that delivers on schedule and budget.
New residential construction
Ground-up homes built on your lot. Foundation to finish under one schedule and one team.
Property additions
Square footage expansion, second stories, and ADUs. Engineered to match the existing structure.
Structural work
Load-bearing changes, foundation reinforcement, and engineered modifications signed by a Florida PE.
Design/Build
Architecture and construction under a single contract. One team, one budget, one timeline.
Ground-up builds, planned end to end
New construction in South Florida means soil testing, elevation surveys, hurricane-rated assemblies, Miami-Dade product approval, and a permit set that matches what gets built. We plan all of it on day one, so the foundation pour, the framing, and the certificate of occupancy all land on the dates we committed to.
From concept to keys, everything we handle
We coordinate architects, engineers, soil consultants, surveyors, and every trade through closeout. You get a single project lead, a complete permit set, weekly progress photos, and a finished build delivered with the structural calcs, warranties, and as-built drawings in your hands.
- Single-family ground-up construction
- Additions, second stories, and ADUs
- Structural and load-bearing work
- Design/Build under one contract
- Florida-licensed engineering coordination
- Miami-Dade product approval expertise
- Hurricane-rated assemblies as standard
- Permit-to-CO management included
Building from the ground up or adding to what you have should not feel chaotic. Contact us today to discuss your new construction project.
Recent new builds and additions
Frequently asked questions
How long does new construction take in Miami?
A standard single-family ground-up build runs 9 to 14 months from permit issuance. Additions and ADUs typically take 4 to 8 months depending on size and structural complexity. We deliver a milestone schedule after the first site visit and update it monthly with progress photos.
Do I need an architect, or can you handle plans?
Both options work. For Design/Build projects we coordinate with our trusted Miami architects under a single contract, so you have one team accountable for design and construction. If you already have a designer, we work directly with them from preconstruction through permits.
What is Miami-Dade product approval and why does it matter?
Miami-Dade has stricter wind and impact requirements than most of Florida. Every exterior assembly, including windows, doors, roofing, and impact-rated cladding, must be on the approved product list. We specify only approved products and submit the NOAs with our permit package, so reviews go through cleanly.
Can you build on an empty lot I already own?
Yes. We start with a site survey, soil testing if needed, and a feasibility check against current zoning and setbacks. From there we coordinate plans, permits, and construction. If you are still evaluating lots, our licensed Real Estate team can help you assess buildability before purchase.






